Elektro Ljubljana distribution model
1,616 nodes · 110/20/0.4 kV · with PV
- Overvoltage node near PV
- 1.065 → 1.012 p.u.
- Undervoltage node in PV micro-grid
- 0.918 → 0.958 p.u.
- Computation time
- 76 s, office PC
Research & validation
Simulation results
1,616 nodes · 110/20/0.4 kV · with PV
19 busbars · 10.5–400 kV · voltage-control shunts off
Results are steady-state simulations on utility network models (TRL 4). The next step is a pilot on real feeders to reach TRL 5.
Publications
Founder
Power-systems engineer
Darko leads the development of OptiVolt, building on his MSc research and published work on smart voltage control and network model interoperability. Based in North Macedonia and familiar with the national grid code, he works closely with operators to shape the product around real network needs.